Repair FWCS Information Overview

Repair FWCS Repair FWCS Thank You

Back to Repair FWCS
Abbett Elementary School

Timeline: **

  • Chillers - Construction - 2013
  • Window/Curtain Wall/Masonry - 2013

$1,885,465 *

61,645 square feet

279 students

4325 Smith Street

Pre-K-5th grade

Built 1949

Site is 5.1 acres


Infrastructure    
Replace windows/window systems and restore masonry
Chiller (air conditioning unit) addition PDF
Window Replacement/Masonry Restoration Bid Award PDF
Equipment PDF
$991,715
$893,750
 


  $1,885,465 *  

* All costs are estimates. These figures will be updated when actual costs are available