Repair FWCS Information Overview

Repair FWCS Repair FWCS Thank You

Back to Repair FWCS
Brentwood Elementary School

Timeline: **

  • Roof - 2015
  • Window/Curtain Wall/Masonry - 2015

$729,968 *

47,217 square feet

551 students

3710 Stafford Drive

Pre-K-5th grade

Built 1957

Site is 10.3 acres


Infrastructure    
Roof catch-up
Replace windows/window systems and restore masonry
$130,075
$599,893
 


  $729,968 *  

* All costs are estimates. These figures will be updated when actual costs are available

** Timeline is subject to change