Repair FWCS Information Overview

Repair FWCS Repair FWCS Thank You

Back to Repair FWCS
Shawnee Middle School

Timeline: **

  • Roof - 2014

$382,800 *

106,818 square feet

787 students

1000 East Cook Road

Grades 6-8

Built 1975

Site is 18.9 acres


Infrastructure    
Roof catch-up $382,800  


  $382,800 *  

* All costs are estimates. These figures will be updated when actual costs are available

** Timeline is subject to change