Repair FWCS Information Overview
Back to Repair FWCS
Northrop High School
Timeline: **
$830,775 *
355,895 square feet
2,252 students
7001 Coldwater Road
Grades 9-12
Built 1971
Site is 78.5 acres
| Infrastructure |   |   | |||
| Roof catch-up | $830,775 | ||||
| $830,775 * | |||||









