Northrop High School

Timeline: **

  • Roof - 2014-2015

$830,775 *

355,895 square feet

2,252 students

7001 Coldwater Road

Grades 9-12

Built 1971

Site is 78.5 acres


Infrastructure    
Roof catch-up $830,775  


  $830,775 *  

* All costs are estimates. These figures will be updated when actual costs are available

** Timeline is subject to change