Back to Repair FWCS
Wayne High School

Timeline: **

  • Roof - 2015

$88,275 *

318,613 square feet

1,546 students

9100 Winchester Road

Grades 9-12

Built 1971

Site is 80.3 acres


Infrastructure    
Roof catch-up $88,275  


  $88,275 *  

* All costs are estimates. These figures will be updated when actual costs are available

** Timeline is subject to change