Repair FWCS Information Overview
Back to Repair FWCS
Levan Scott Academy
Timeline: **
$1,438,839 *
34,045 square feet
296 students
950 East Fairfax Avenue
Pre-K-5th grade
Built 1955
Site is 9.9 acres
| Infrastructure |   |   | |||
| Roof catch-up Replace windows/window systems and restore masonry Chiller (air conditioning unit) addition Equipment |
$114,125 $444,714 $880,000 |
||||
| $1,438,839 * | |||||









