Washington Elementary

Timeline: **

  • Roof - 2015

$36,300 *

40,602 square feet

263 students

1015 W. Washington Boulevard

Pre-K-5th grade

Built 1929

Site is 2.2 acres


Infrastructure    
Roof catch-up $36,300  


  $36,300 *  

* All costs are estimates. These figures will be updated when actual costs are available

** Timeline is subject to change