Back to Repair FWCS
Northwood Middle School

Timeline: **

  • Roof - 2014
  • Windows/Masonry - 2014

$1,648,143 *

82,247 square feet

662 students

1201 E. Washington Center Road

Grades 6-8

Built 1959

Site is 28.3 acres


Infrastructure    
Roof catch-up
Replace windows/window systems and restore masonry
Roofs BondPDF
Windows BondPDF
$206,250
$1,441,893
 


  $1,648,143 *  

* All costs are estimates. These figures will be updated when actual costs are available

** Timeline is subject to change