Repair FWCS Information Overview

Repair FWCS Repair FWCS Thank You

Back to Repair FWCS
South Side High School

Timeline: **

  • Roof - 2015

$67,650 *

352,617 square feet

1,525 students

3601 South Calhoun Street

Grades 9-12

Built 1922

Site is 23.6 acres


Infrastructure    
Roof catch-up $67,650  


  $67,650 *  

* All costs are estimates. These figures will be updated when actual costs are available

** Timeline is subject to change