Repair FWCS Information Overview
Back to Repair FWCS
Portage Middle School
Timeline: **
$1,954,354 *
77,941 square feet
473 students
3521 Taylor Street
Grades 6-8
Built 1960
Site is 19.8 acres
| Infrastructure |   |   | |||
| Roof catch-up Replace windows/window systems and restore masonry Chiller (air conditioning unit) addition Equipment |
$37,950 $1,366,404 $550,000 |
||||
| $1,954,354 * | |||||









