Repair FWCS Information Overview

Repair FWCS Repair FWCS Thank You

Back to Repair FWCS
Snider High School

Timeline: **

  • Major Projects - 2013-2016
  • Site Improvements - 2013

$40,289,381 *

340,761 square feet

1,905 students

4600 Fairlawn Pass

Grades 9-12

Built 1965

Site is 29.9 acres


Infrastructure $19,760,060 $58/sf
Replace the heating and cooling system
Replace windows and window systems
Restore the masonry
Underground storm water retention
Additional bus lane
  Professional services fees $5,434,016  
  Contingency $1,976,006  
Click here to see some of the needed repairs at Snider. Photo Gallery  

Access and Safety $2,044,566 $6/sf
ADA accessibility, 504 compliance
Replace fire alarm system
Bring up to current code; stairs, stairwells, and handrails
  Professional services fees $562,256  
  Contingency $204,457  

Classroom Infrastructure - as needed $7,496,742 $22/sf
Modular Units for Snider High School PDF
Snider Site Work Package PDF
Replace flooring
Replace ceilings and lights in classrooms
Replace chalkboards with dry erase boards
Replace storage casework
Replace classroom doors
Replace Venetian blinds
Re-paint classrooms and corridors
  Professional services fees $2,061,604  
  Contingency $749,674  
  $40,289,381 *  

* All costs are estimates. These figures will be updated when actual costs are available

** Timeline is subject to change