Repair FWCS Information Overview
Back to Repair FWCS
Snider High School
Timeline: **
$40,289,381 *
340,761 square feet
1,905 students
4600 Fairlawn Pass
Grades 9-12
Built 1965
Site is 29.9 acres
| Infrastructure | $19,760,060 | $58/sf | |||
| Replace the heating and cooling system Replace windows and window systems Restore the masonry Underground storm water retention Additional bus lane |
|||||
| Professional services fees | $5,434,016 | ||||
| Contingency | $1,976,006 | ||||
| Click here to see some of the needed repairs at Snider. |
|||||
| Access and Safety | $2,044,566 | $6/sf | |||
| ADA accessibility, 504 compliance Replace fire alarm system Bring up to current code; stairs, stairwells, and handrails |
|||||
| Professional services fees | $562,256 | ||||
| Contingency | $204,457 | ||||
| Classroom Infrastructure - as needed | $7,496,742 | $22/sf | |||
| Modular Units for Snider High School Snider Site Work Package Replace flooring Replace ceilings and lights in classrooms Replace chalkboards with dry erase boards Replace storage casework Replace classroom doors Replace Venetian blinds Re-paint classrooms and corridors |
|||||
| Professional services fees | $2,061,604 | ||||
| Contingency | $749,674 | ||||
| $40,289,381 * | |||||